My son has a 1969 SS Camaro that he has owned for 12 years.  Over the years he has installed Vintage Air, Tremec 5 speed, and a fuel injection system that he designed and built from scratch.

In an attempt to reduce the stress cracks that appear from twisting of the body under torque, he had decided to replace the rear frame pieces and install heavy duty frame connectors.  We are also going to mini-tub it and install the DSE Quadra-Link rear suspension.    My neighbor had two extra stalls and graciously allowed me to take my cars there so we would have the entire garage for this project.  Just before Thanksgiving,  my son hauled all of the various parts to my house.  After unloading them from his sagging ’79 El Camino, we trial assembled the rear disc brakes along with his new 15×10 Torque Thrust wheels.  Everything fit as it should.

To make cutting out the frame members, wheelwell sheet metal and the metal for installing the frame extenders, he bought a plasma cutter.  He has been practicing with it in making some of the gussets that will be needed.   He brought the car over the next day and we  began taking out the interior, removing the rear end, springs, gas tank, etc.  It was interesting.

 

 

It was a long day but we accomplished a lot.  Matt decided it would be best to mock up the axle with the brakes and lines to make sure everything fit.  All was well on one side, but the other presented a problem.  He could not install the long bolt that holds the brake pads as it interfered with a bracket on the axle.  Our first thought was to drill a hole in the bracket so we could pass the bolt through it.  However, as luck would have it, the place we needed to drill a hole was exactly on one of the welds.  Time for plan “B”

After some discussion, it was decided that we would have to install the caliper with pads to the mount and then install the mount to the axle.  This presented another problem as the nuts were not accessible once we mounted the rotor.  The solution was to weld nuts on the back side of the mount so we could install the bracket.  This makes changing the pads on this side a royal pain in the !@#.  However, since rear brake pads wear so slowly, it was a compromise we could live with.

We also had to modify the brake line holder to accomodate the fitting with it’s locating keys.  Matt also welded on a stud to hold the distribution block for the brake lines.  Once he was sure everything fit, he removed all of the parts so he could have the axle housing either painted or powder coated.

While Matt was working on the axle, I was preparing the trunk and interior.  Everything had to come out of the trunk including the battery and the NOS bottle.

 

 

 

Now it was time to remove the seats, carpet, electronics, rear side panels, seat belts, etc.  He had the floor pans replaced about three years ago but a problem surfaced on the passenger side.  It appears condensation is leaking from the AC system and is pooling in that footwell.  We discovered that this was caused by the drain on the AC.   The pans under the rear seats are original and have some very slight surface rust.  Overall, it looked better than Matt expected.  After pulling the carpet and seeing how faded and worn it was, I now know what his Christmas present will be!

After lunch at Mickey D’s and his fourth stop at Ace Hardware to buy fasteners, we began to attack the bottom.  First thing to go was the exhaust, then the drive shaft and the gas tank. He is replacing the brake lines so we cut out the old ones rather than trying to remove the rusted fittings.

Time to get the big heavy rear end out of there.  Matt was very concerned about the change in the balancing point once we removed the axle and leaf springs.  We surely did not want the car to tip off the hoist so we tied the car to the hoist with tie down straps.  Good thing because even with the straps in place, the rear of the car came up off the supports.  We had to ratchet the straps even tighter. Plus the driver’s door now did not want to close.  To put some weight on the rear, we put three five gallon pails in the trunk and filled them with water.  The door now closed.  When we are cutting and fitting everything, we are going to use my tall jack supports under the front end to make sure the car stays in alignment.

We remounted the rear wheels and tires, removed all of the fasteners, and then simply raised the car away from everything.  Worked like a charm and it was now 6:30PM and time to quit for the day.

Advertisements

Leave a comment

No comments yet.

Comments RSS TrackBack Identifier URI

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s